Setting Up a New Solar Project from Land Geotechnical Survey to Phase 2 Investigation

Understanding the Importance of Geotechnical Surveys

Before installing a solar farm, you need to assess the ground and groundwater conditions. A geotechnical survey helps determine soil stability, load-bearing capacity, and drainage issues. This ensures that your renewable energy development has a strong foundation and avoids costly problems later. Companies like Ibex provide expert geotechnical services to help you assess site conditions and make informed decisions.

Conducting a Phase 1 Desk Study

A Phase 1 desk study is the first stage in site investigation. It involves reviewing maps, previous land use, and geological records. This helps identify potential impacts such as contamination, subsidence, or flood risks. If concerns arise, further testing may be required.

Carrying Out a Ground Investigation

Once the desk study is complete, a site investigation is undertaken. This includes taking soil and rock samples to assess ground conditions. Boreholes, trial pits, and laboratory testing provide detailed information. Developers use these results to determine the best foundation design and ensure stability.

Addressing Soil Stability and Drainage

For a solar project to be successful, the site must have stable ground. Poor conditions can affect efficiency and lead to structural issues. Geotechnical engineers assess these risks and recommend ground improvements if necessary. Proper drainage solutions also help maintain the long-term life of the installation.

Understanding the Need for a Phase 2 Investigation

If the Phase 1 assessment raises concerns, a Phase 2 investigation is required. This involves more detailed inspections and testing to verify contamination levels or structural integrity. Sample analysis can help evaluate risks and demonstrate compliance with planning application requirements.

Ensuring Compliance with Regulations

A renewable energy project must meet UK planning and permitting regulations. Local authorities may require detailed reports before granting approval. A basement impact assessment may also be needed for basement development near critical infrastructure or neighbouring properties. Proper assessments ensure compliance and prevent delays.

Making Informed Decisions for Construction

With site investigation results, developers can make confident choices. Engineers can design suitable foundations, determine the best construction methods, and extend the project’s efficiency. Inspections and monitoring during construction help verify safety and support long-term maintenance.

Conclusion

Setting up a new solar project from land geotechnical survey to Phase 2 investigation involves multiple assessments to identify risks and ensure safe installation. Geotechnical services, site monitoring, and reporting are crucial for successful development. By completing these steps in detail, developers can deliver efficient and sustainable renewable energy projects that align with industry standards and client expectations.